翻訳と辞書
Words near each other
・ Niatross
・ Niau
・ Niau Airport
・ Niau kingfisher
・ Niaux
・ Niavan
・ Niavaran
・ Niavaran Palace Complex
・ Niavaran Park
・ Niavol
・ Niawiakum River
・ Niawier
・ Niayes Arrondissement
・ Niayesh
・ Niayesh Expressway
Niayesh Tunnel
・ Niaz
・ Niaz Ahmed
・ Niaz Ali
・ Niaz Bolagh
・ Niaz Diasamidze
・ Niaz Fatehpuri
・ Niaz Khan
・ Niaz Mohammad Stadium
・ Niaz Morshed (Dhaka cricketer)
・ Niaz Morshed (disambiguation)
・ Niaz Morshed (Khulna cricketer)
・ Niaz Murshed
・ Niaz Sallem
・ Niaz Stadium


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Niayesh Tunnel : ウィキペディア英語版
Niayesh Tunnel

The Niayesh Tunnel Project is in the north of Tehran, Iran.
Unlike the Tohid and Resalat Tunnels, this tunnel has two parallel roads that are within of each other for most of the route. Traffic in the north tunnel flows from east to west. In the south tunnel it flows from west to east. For the first time in Iran, there are some embranchments of other tunnels among main tunnels. Among the north tunnel, Kordestan tunnel with a length of – the same length as the Resalat tunnel – is branched from the north tunnel that it makes accessible to downtown and Hemmat highway through a connection between the north tunnel and Kordestan Highway. Also, the north Kordestan highway would be connected to the south tunnel through a tunnel that provides traffic flow to east Tehran. The total length of the main tunnels as the second longest urban tunnel in the world excluding ramps is . The total length of the main tunnels and access tunnels, including ramps, is .
==Project implementation==
Main tunnel execution started 26 March 2011 after finishing the site mobilization. On 19 March 2012 all the excavation finished.
The average rate of excavation in tunnel was per day with NATM method of excavating. It was one of the fastest excavations in the world, considering the tunnel dimensions. In this project soil excavated in the ramps areas.
The concrete volume poured was , of which 95 percent was done during 7 months using 17 formworks. The average rate of pouring concrete was per day for the tunnel's full face. This project has peripheral buildings which are built within three months. The main control building was built by modern methods and prepared for ITS systems installation within two months. In executing parts of the project, considering the job difficulties, there were three working shifts each day that the number of labor achieved to 4800 persons and it can be considered 6000 persons including indirect workers.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)